国开(浙江开放大学)23秋《理工英语4》形考任务4【标准答案】

时间:2024-04-30 08:03:42 5A范文网 浏览: 平时作业 我要投稿

单元自测4(10分)
试卷总分:100 得分:100

一、选择填空:阅读下面的对话或句子,从A、B、C三个选项中选出一个能填入空白处的最佳选项。

1.— Do you prefer a portableor a clumsy3D printer

— .
A.No, a portable 3D printer is more useful.
B.Yes, Iwould not have a clumsy one.
C.I prefer a portableone to a clumsy one.

2.— 3D printingis one of the latest technologicalinnovations.

—____Maybe its functions are questionable.
A.Really
B.Exactly.
C.I think so.

3.—Do youlike that technology exhibition

— Yes, Ilike it very much. .
A.It finally comes true.
B.It shows me the impressive magic power of 3D printing.
C.It is a good chance.

4.Touch- ____3D mapshelp the blind too much.
A.responsive
B.speaking
C.listening

5.3D printers have spread from labs to industrialfactories, ____they are being cheaper and cheaper.
A.so
B.and
C.yet

6.二、阅读理解:阅读下面的短文,根据文章内容进行判断,正确为“T”,错误为“F”。

Passage 1(教材课文原文)

“The printer did not always manage to spread the plastic evenly, making some of the ribs of the honeycomb structure of the block uneven,” reported ARN(Australian Radio Network)to the surprise of no one who has used a 3D printer. But the architects remain optimistic. The first few printed blocks are meant to be test pieces as they improve the process.

It takes about a week to print a 3-meter high block right now. The project’s leaders hope to eventually get that down to two hours and finish the first of 12 rooms in a year, and the entire house in less than 3 years.

Ultimately, 3D Print Canal House is an architectural research project, one that is very much being conducted in the public eye: you can actually buy tickets to visit the construction site for 2.50 Euros.

The top floors will become more ornate, for example, as newer techniq国开电大答案请进:opzy.net或请联系微信:1095258436
ues are incorporated. They’ll explore the possibilities of 3D printing, like the honeycomb walls or an entire room recycled, redesigned, and built anew. Nobody’s going to move into a 3D printed house soon, but, if anyone ever does, something might be learned from this experiment by the canal.

According to the passage, the 3D printer can type with plastic evenly. 1

2. This 3D printerprinted some blocks totestits work. 2

3. The project’s leaders will finishthe entire house in less than 3 years. 3

4. 3D Print Canal House is printed to live. 4

5. The canal house will be decorated more. 5
(1).__1__
A.T
B.F
(2).__2__
A.T
B.F
(3).__3__
A.T
B.F
(4).__4__
A.T
B.F
(5).__5__
A.T
B.F

奥鹏国开作业答案请进opzy.net或添加微信:1095258436

来源:网络整理 免责声明:本文仅限学习分享,如产生版权问题,请联系我们及时删除。

相关文章:

国开(陕西开放大学)23秋《工程经济与管理》形考任务6【04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务7【04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务5【04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务3【04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务4【04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务2【04-30

国开(陕西开放大学)23秋《行政组织学》形考任务5【标准04-30

国开(陕西开放大学)23秋《工程经济与管理》形考任务1【04-30

国开(陕西开放大学)23秋《行政组织学》形考任务4【标准04-30

国开(陕西开放大学)23秋《管理英语2》形考任务7【标准答04-30

热搜文章
最新文章